Special topics
Ghana’s first floating production storage and offloading (FPSO) vessel, FPSO Kwame Nkrumah, is scheduled to be shut down from Thursday.
The shutdown will lapse three weeks after which the vessel will undergo another downtime, from Monday, March 19 to Saturday, April 7.
These were disclosed on Tuesday by a Petroleum Engineer at the Ghana National Petroleum Corporation (GNPC), Albert London.